Metal Stud Ceiling Framing
Bridging fire stops soil pipes etc must not protrude beyond framing.
Metal stud ceiling framing. Consequently you have to use a water level or a 4 spirit level and a chalk line as to mark the perimeter of the steel stud framing. The first step of this project is to fasten the metal track to the wall. All framing lumber should be the correct grade for the intended use and 38 mm x 89 mm nominal 2 x 4 or larger should bear the grade.
On the floor lay out and mark the location of the wall fasten the steel track photo 2 and then locate the position of the ceiling track using a plumb bob or a level held against a steel stud. If there is no room for a stud above attach short studs to each ceiling stud and screw them to the framing above. Metal stud ceiling framing.
Studs and joists must be in true alignment. Then cut short studs to attach to that stud to the framing above about every four feet. 2 1 2 250s 3 1 2 350s 3 5 8 362s 4 400s 5 1 2 550s 6 600s 8 800s 10.
Metal stud framing costs. This brace sits on top of the ceiling studs. Afterwards you have to install the metal track alongside the.
Clarkdietrich cold formed steel c studs general cold formed steel framing faqs general steel home construction faqs new clarkdietrich itools structural stud lookup tool clarkdietrich studs are made in a variety of flange widths to meet different applications. The metal tracks and studs are installed firmly therefore the frame is perfectly level as we have used the laser level. The best technique for framing steel walls is to first fasten the floor and ceiling tracks and then install the studs one at a time.
The metal stud ceiling frame is completed after about 3 hours of continuous work. Make sure you install the metal studs every 15 25 otherwise they won t be able to support the weight of the plasterboards. Fastening the metal truck to the walls.