How To Install Suspended Ceiling Grid
How to install a suspended ceiling step 1.
How to install suspended ceiling grid. Stretch additional strings to pre bend other hanger wires to help level entire ceiling. Setting the perimeter the first step is to determine the maximum height of the new suspended ceiling. Put a secondary runner every 2 ft 0 61 m along your main runners.
Mark the level the new. With the dealer plan the layout for the. Try to avoid nailing on or near the corner beads it s a sure way to cause nail pops and cracks.
Stretch a string from nail to nail along a row of wires d. Snap a chalk line marking the top of the wall angle. Nail the wall angle at every stud with 1 1 4 in.
In a nutshell installing a drop ceiling has several parts. Preparing the space for installation measuring for your border panels and for hanging hardware placement installing the ceiling grid cutting border panels and then fitting panels into the grid. Lift your 4 ft 1 2 m runners above the main runners and feed them into the slots on the mains.
How to install a suspended ceiling with ceiling tiles step 1. Setting the perimeter with the perimeter established locate the wall studs and nail the perimeter molding in. Remove leveling string s after pre bending wires.
Swing hanger wires over to string and bend each one at 90 where they touch the string e. Pick a height so the ceiling tile will clear the lowest ceiling obstruction like plumbing lines or ductwork. Install the secondary runners perpendicular to your mains by clipping them in place.