How To Build A Bulkhead For A Ceiling
Justdoityourself lovingit perfecteverytime subscribe now and hit the bell to get notified about new videos https www youtube.
How to build a bulkhead for a ceiling. Place 2 by 4 stakes on the back side of the bulkhead at an angle and into the side of the footer bank. From the wall plate. How do frame a bulkhead.
Clients frequently ask us about bulkheads and want to understand their purpose and here s our answer. If it is in a corridor for example it will be the distance from one side wall to the other. Bulkheads are typically used to conceal something.
Screw a plate to the vertical sheet before cutting the sheet. Then create a box frame out of the lumber. The vertical side trim overhangs the ceiling.
Attach the plates to the studs in the ceiling and wall with a nail gun. Extend the plate to connect to the wall plate or timber in this case. It s important that you hit the studs and or ceiling joists with each nail as these nails will be supporting a significant amount of weight.
Measure the length of where the bulkhead will be installed. Using a miter saw cut the 2 by 4 inch lumber to the exact measurements that you need. Use 2x4 lumber cut to your measurements with a miter or table saw image 1 and attach it to the wall and ceiling studs with a framing nail gun images 2 and 3.
It s not uncommon to have bulkheads in your kitchen bathroom or basement. Chaulk a line on the back of the sheet. Every end joint is a straightforward square cut.